You booked a dozer on the RGN and the question keeping you up isn't the rate โ it's whether the real machine matches the dimensions on the order, and whether your chains are rated for what you're about to pull. Get those two things right and the rest of the job is routine.
Here are the machinery hauling tips that actually keep you legal, loaded safely, and off the DOT scale's bad side.
Verify weights and dimensions before you leave
Spec sheets lie, or at least they describe the base machine. The one you're loading has a bucket, a ripper, dual tires, or a counterweight the shipper forgot to mention.
Before you commit to a route or a permit:
- Get the operating weight with attachments, not the shipping weight.
- Confirm travel height on your deck โ a machine that clears at 13'6" on the ground may not after it's up on an RGN or lowboy.
- Check overall width and overhang; tracks and blades push you into oversize fast.
Those numbers drive your permits and your escape routes. When something doesn't match what you were told, tell your dispatcher before you load, not after you're stuck under a bridge. A dedicated ARI dispatcher who knows heavy-haul lanes can sort permits and re-routes while you're still at the shipper.
Load angles and ramp discipline
Most machinery damage and most loading injuries happen on the ramps. Low-ground-clearance equipment hangs up where the ramp meets the deck โ that transition angle is where a scraper or paver drags its belly.
Working rules that hold up:
- Load on firm, level ground. A soft shoulder changes every angle and can tip a machine.
- Spot the trailer straight and chock it so it can't creep.
- Drive slow and straight up the center; no steering corrections mid-ramp.
- Heavy end toward the front for proper weight distribution over your drives and steers.
Use a ground guide for anything you can't see over. A $200 spotter beats a $40,000 repair every time.
Chain placement on tracked vs. wheeled machines
Securement is where the rules get specific, and where officers write tickets. Heavy equipment over 10,000 lbs generally needs a minimum of four tie-downs, plus separate securement for any attachment like a bucket or blade.
Tracked machines
Chain the machine itself, not just the tracks. Run chains to the manufacturer's designated tie-down points or solid structural members โ front and rear, pulling in opposing directions so the machine can't shift fore or aft. Lower blades and buckets to the deck and secure them independently.
Wheeled machines
Wheeled equipment moves on its suspension, so set the parking brake, chock the tires, and chain to the frame or rated points โ never to axles or over tires that let the machine bounce loose. Opposing angles again: you're boxing it in from every direction.
Match chain and binder working-load limits to the aggregate weight you're securing, and keep your grade-70 transport chain in inspection-ready shape. Build a securement refresher into your routine โ our owner-operator resources are a good place to keep that knowledge sharp.
The walk-around before wheels roll
Last thing, every time: a full lap. Check every chain and binder for tension, confirm attachments are down and tied, verify your height one more time with a stick, and confirm flags, banners, and lights for oversize. Re-check binders after the first few miles โ loads settle.
Run heavy haul under real authority
Machinery pays, but only if you can access the loads and keep more of the rate. With ARI you run under our DOT/MC authority on an 82% revenue share, with all trailer types including RGN and lowboy, same-day pay with no quick-pay fees, and a dispatcher capped at seven trucks who actually knows heavy-haul lanes. You pick the loads โ no forced dispatch.
If you've got the truck and the experience to haul equipment right, see the owner-operator opportunities at ARI or call (888) 600-9098 to talk lanes.
